Industry focus
Oil & Gas
Controls and SCADA engineering for oil and gas: hazardous-area classification, intrinsically safe design, unmanned site telemetry and pipeline monitoring. Two constraints dominate: area classification determines what equipment may be installed and how it must be wired, and sites are frequently unmanned, so the control system has to behave correctly with nobody present.
Area classification comes before device selection. Zone or division classification governs enclosure type, wiring method, purge and pressurization, barrier and isolator selection, and the certification of every installed device. It is established first, because it invalidates designs made without it. Unmanned operation changes the failure question. The design question is not what the operator does when this alarms, but what the system does when nobody is there for six hours. Fail-safe states, communication-loss behavior and local autonomy are the design. Telemetry is unreliable by nature: cellular, radio and satellite links drop. Store and forward, local historization and reconciliation on reconnection are baseline requirements, not enhancements.
Sector facts
At a glance
Buyer questions
Frequently Asked Questions
Do you design for hazardous areas?
Yes. Area classification governs the design: enclosure type, wiring method, purge and pressurization, barrier and isolator selection, and device certification. Classification documentation is established at scoping, since designs produced without it usually have to be redone.
Can you support remote unmanned sites?
Yes. Unmanned sites drive the design toward local autonomy, defined communication-loss behavior, store-and-forward telemetry and alarm routing that reaches a person rather than an empty control room.
Planning a oil & gas project?
Describe your equipment, process, or software objective and a senior engineer will review the technical fit.