Pharmaceutical
Controls engineering for pharmaceutical manufacturing: GMP practice, 21 CFR Part 11 audit trails, change control and validation records built for inspection. In this sector the documentation burden is not overhead around the engineering; it is a large share of the engineering, because a change that is not documented, tested and approved has not been made as far as an inspection is concerned.
Documentation is the deliverable. Specification, design, installation and operational qualification, traceability matrices and test evidence are the work product. A change made correctly but recorded loosely fails the same audit as a change made badly. 21 CFR Part 11 shapes the system design. Electronic records and signatures require unique user identity, audit trails that record who changed what and when, protection of records over their retention period, and controls that cannot be quietly disabled. Change control governs schedule. In an unregulated plant a logic change is an afternoon; in a validated one it is an assessment, an approval, a test protocol, execution and a report. Estimating validated work on unregulated assumptions is the most common way these projects overrun. ISA-88 structure makes batch systems maintainable by keeping recipes, procedures and equipment control separate, so a recipe change does not require an equipment revalidation.
Sector facts
At a glance
Buyer questions
Frequently Asked Questions
Do you work under validation protocols?
Yes. Controls and software work in regulated environments is delivered with specification, qualification and test documentation, executed under the site's own change control. The site's quality function owns the protocols; the engineering is performed and evidenced to them.
What does 21 CFR Part 11 require from a control system?
In practice: unique user identity, an audit trail recording who changed what and when, protection of records for their retention period, and controls that cannot be silently disabled. It is a system design requirement, not a documentation exercise added at the end.
Why do validated projects cost more?
Because documentation and testing are a large share of the work rather than a wrapper around it. Each change needs an assessment, an approval, protocol execution and a report, and a quote built on unregulated assumptions leaves all of that out.
Planning a pharmaceutical project?
Describe your equipment, process, or software objective and a senior engineer will review the technical fit.