Skip to main content

Engineering solution

Connected Factory Data & AI Pilot

The Connected Factory Data & AI Pilot connects a defined set of machines to a reliable data foundation — collection, storage, context, and dashboards — and then applies analytics or AI to one specific production decision. The pilot is scoped around a measurable question, so success or failure is visible in weeks, not promised in years.

Why this solution exists

Most industrial AI initiatives fail before the model stage because the underlying data is missing, untrusted, or lacks context. A vibration alert means nothing without knowing which product was running and whether the machine was in changeover.

This pilot builds the foundation first: machine connectivity, contextualized storage, and dashboards operators actually trust. Only then is an analytics or AI layer applied — to a single decision your team chooses, with acceptance criteria agreed before work begins.

This is a strong fit when

  • Manufacturers whose machine data is trapped in PLCs or paper logs
  • Teams asked to 'do AI' without a data foundation
  • Plants that want downtime, quality, or OEE visibility they can trust
  • Leaders who want AI evaluated against a measurable decision, not a demo

Scope

What the work includes

Data foundation

  • Connectivity to selected PLCs, sensors, and equipment (OPC UA, MQTT, native drivers)
  • Time-series or relational storage sized for the pilot
  • Context modeling: product, shift, state, and event tagging
  • Operator and management dashboards for the pilot scope

Analytics / AI layer

  • One decision selected with your team (e.g., downtime causes, quality drivers, anomaly alerting)
  • Baseline reporting before any model is applied
  • Model or analytics implementation with documented method
  • Side-by-side evaluation against the agreed acceptance criteria

Required inputs and deliverables

What we need from you

  • The production question the pilot must answer
  • Access to selected machines, networks, and any existing historians
  • IT/OT security requirements and approval path
  • Operator input on how results should be displayed and used

What you receive

  • Working data pipeline from the selected machines to storage and dashboards
  • Documented data model and integration architecture
  • Analytics or AI implementation for the chosen decision
  • Evaluation report against the agreed acceptance criteria
  • A scale-up recommendation, including an honest 'do not scale' option

Project process

How the engagement runs

  1. STEP 1

    Frame the decision

    Agree on the single production question, its baseline, and what evidence would justify scaling.

  2. STEP 2

    Connect and collect

    Establish machine connectivity and contextualized storage for the pilot scope.

  3. STEP 3

    Make data visible

    Deliver dashboards so the team can verify the data is right before any modeling.

  4. STEP 4

    Apply analytics or AI

    Implement the analysis layer with documented methods and limitations.

  5. STEP 5

    Evaluate and decide

    Compare results against acceptance criteria and recommend scale, adjust, or stop.

What success looks like, by pilot type

Connected Factory Data & AI Pilot: what success looks like, by pilot type
Pilot typeWhat success looks likeHow it is measured
Visual inspectionCatches the defect class that escapes sampling, at line speedAn agreed defect set, measured against manual inspection over an agreed period
Predictive maintenanceFlags a developing fault far enough ahead to act on itLead time on known historical failures, plus the false-alarm rate
Knowledge assistantFinds the right passage faster than searching by handAnswer accuracy over a fixed question set, checked by the people who use it
Production analyticsNumbers that reconcile with the production meetingAgreed metric definitions, matched against manual counts

Risks and limitations we state up front

  • Poor sensor coverage may require instrumentation before useful analysis is possible; this is identified early.
  • Some questions turn out to be answerable with plain analytics — we will say so rather than force an AI approach.
  • Data quality issues discovered mid-pilot can extend the timeline; they are reported, not hidden.
  • Pilot results apply to the piloted scope; scaling claims require scaled evidence.

What drives cost and schedule

We do not publish fixed prices: these are the factors that determine effort. A scoped proposal follows the technical fit review.

  • Number and age of machines to connect
  • Existing network readiness and security requirements
  • Whether new sensors or edge hardware are required
  • Complexity of the chosen decision and required model validation
  • On-premise versus cloud hosting preferences

What this engagement is not

A pilot can conclude that the data does not support the use case. That is a valid and comparatively cheap outcome, and it is stated as a result rather than converted into a longer engagement.

Last reviewed by Geek Engineering senior engineering review.

Connected Factory Data & AI Pilot: common questions

What data foundation is required before industrial AI?

At minimum: reliable collection from the machines involved, storage with timestamps and production context (product, shift, machine state), and enough history to represent normal operation. Without context, models correlate noise. The pilot builds exactly this foundation before any AI is applied.

What is a safe first manufacturing AI pilot?

One bounded decision with a measurable baseline — for example, classifying the true causes of downtime on one line, or flagging anomalies on one critical asset. Safe pilots run alongside existing controls and advise people; they do not take control actions until they have earned trust.

Can this work with our existing historian or SCADA?

Yes. If a historian, SCADA, or MES already collects useful data, the pilot builds on it rather than duplicating it. The assessment step maps what exists, what is trustworthy, and what gaps must be filled for the chosen decision.

Do we lose the work if the AI layer is not worth scaling?

No. The connectivity, storage, and dashboards remain a permanent data foundation regardless of the AI outcome. That is deliberate: the pilot is structured so the non-AI value stands on its own.

Discuss this solution with a senior engineer

Describe your equipment, objectives, timeline, and constraints. We will confirm whether this solution fits — and say so plainly if it does not.

Get a Quote