Troubleshooting
- Program review and live diagnostics on the running system
- High-speed data capture around fault events where useful
- Electrical and instrumentation checks tied to observed symptoms
- Root-cause documentation, not just symptom suppression
Engineering solution
This service puts senior controls engineers on two kinds of problems: equipment that misbehaves — intermittent faults, quality drift, unexplained stops — and automation projects that stalled or went sideways with the original integrator. The work is diagnostic first: establish facts, stabilize the system, then deliver a costed plan to finish or fix it properly.
Some problems do not fit a neat service category: the machine faults every few hours and nobody knows why; the integrator left and the system is 80% done; the new line runs but never at rate. These situations combine technical difficulty with organizational frustration.
Our approach separates diagnosis from repair. First we establish what is actually happening — with data, program review, and field observation rather than opinions. Then we stabilize what can be stabilized quickly. Only then do we propose the permanent fix, with honest scope and cost.
Scope
Project process
Understand symptoms, history, and constraints; agree on diagnostic access.
Capture programs, data, and field observations around the failure or gap.
Identify root cause or the true project state, documented with evidence.
Apply low-risk corrections that reduce immediate production pain.
Deliver and, on approval, execute the plan to finish or fix properly.
| Symptom | Likely cause | What to check first |
|---|---|---|
| Machine stops randomly with no fault code | A condition the program treats as normal, or an input dropping out too briefly to alarm | Alarm and event history against the machine's actual stop times |
| Fault clears when the panel door is opened | Thermal, or a connection disturbed by the door | Panel temperature across a full shift, and terminal tightness on the suspect circuit |
| Problem started after a component was swapped | Configuration not carried over to the replacement | Drive and instrument parameters against the last known-good backup |
| Only fails on one product or recipe | Timing or tolerance that recipe exposes | The sequence step where it stops, with that recipe's parameters |
| Intermittent network dropouts | Segment loading, a duplicate address, or the physical media | Switch port error counters, then the cabling on the failing segment |
| A project stalled with another vendor | Scope never defined well enough to finish | The specification and acceptance criteria, where they exist |
We do not publish fixed prices: these are the factors that determine effort. A scoped proposal follows the technical fit review.
Recovery work starts with diagnosis, and diagnosis has an honest possibility of concluding that the original approach cannot be salvaged economically. That conclusion is delivered plainly rather than absorbed into a larger scope.
Last reviewed by Geek Engineering senior engineering review.
Yes. The engagement starts with an as-found audit: what was promised, what exists, and what is safe. You receive a documented gap list and a completion plan before committing to execution, so the decision to proceed is based on evidence rather than optimism.
With instrumentation rather than waiting and watching: PLC-level event capture, high-speed trending around triggers, and targeted electrical monitoring. Intermittent problems are usually deterministic once the right signals are recorded at the right resolution.
Both, in order. Stabilization comes first when production is suffering, and every patch is documented as temporary. The permanent fix is proposed separately with its real scope, so the difference between 'running today' and 'fixed' stays visible to the owner.
We assess what can be recovered from the hardware and what must be re-engineered from machine behavior. Locked or missing source raises the cost of recovery, and that reality is reflected in the plan rather than discovered late.
Engineering consulting, due diligence, and architecture review capability.
If the root cause is obsolete controls, plan the migration properly.
Selection criteria that reduce the risk of a stalled project next time.
Describe your equipment, objectives, timeline, and constraints. We will confirm whether this solution fits — and say so plainly if it does not.